**ON A/C ALL 3. Job Set-up __________ Subtask 25-65-51-861-051 A. Energize the ground service network (Ref. TASK 24-42-00-861-001). Subtask 25-65-51-010-050 B. Get Access (1) Open the door/access panel of the stowage compartment. ____ NOTE : Megaphone locations are shown with placards, which are bonded on the outside of the stowage compartments. (2) Release/open the strap/clamp. (3) Remove the megaphone from the stowage compartment. 4. Procedure _________ Subtask 25-65-51-960-050 A. Battery Replacement **ON A/C 001-049, 101-149, 151-199, 201-299, (Ref. Fig. 201/TASK 25-65-51-991-001-A) R **ON A/C 051-099, 401-499, (Ref. Fig. 201A/TASK 25-65-51-991-001) **ON A/C 301-399, (Ref. Fig. 201B/TASK 25-65-51-991-001-B)
EFF : CES
ALL
25-65-51
Page 202 Aug 01/05
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 16_部分9.pdf
EFF : CES
ALL
25-65-51
Page 202 Aug 01/05
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 16_部分9.pdf