------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN ------------------------------------------------------------------------------21 23 23 23 O-ring O-ring O-ring O-ring D. Referenced Information ------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------12-11-28-650-003 28-22-00-710-001 28-22-51-000-001 28-22-51-400-001 28-25-00-650-001 28-25-00-650-003 32-12-00-010-001 32-12-00-410-001 57-17-11-000-001 57-17-11-400-001 Pressure Refuel with Automatic Control Operational Test of the APU Fuel-Pump System on Ground to Purge the Fuel Line Removal of the APU Fuel Pump (4QC) Installation of the APU Fuel Pump (4QC) Pressure Defuel To Drain Remaining Fuel from the Wing Tanks and the Center Tank Open the Main Gear Doors for Access Close the Main Gear Doors after Access Removal of the Covers 147AZ (148AZ) Installation of the Covers 147AZ (148AZ) 28-23-05 28-22-05 28-22-05 28-22-05 01D-130 02 -030 02 -060 02A-030
**ON A/C 001-049, 051-099, 101-105, 151-154, 201-207, 28-22-52-991-001 R Fig. 401
**ON A/C 106-149, 155-199, 208-299, 301-399, 401-499, 28-22-52-991-001-A Fig. 401A
EFF : CES
ALL
28-22-52
Page 408 Aug 01/05
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 19_部分6.pdf
**ON A/C 001-049, 051-099, 101-105, 151-154, 201-207, 28-22-52-991-001 R Fig. 401
**ON A/C 106-149, 155-199, 208-299, 301-399, 401-499, 28-22-52-991-001-A Fig. 401A
EFF : CES
ALL
28-22-52
Page 408 Aug 01/05
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 19_部分6.pdf