航空资料室_民航资料_航空手册_飞行手册_机务手册

A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 19_部分9.pdf350页

显示该文档阅读器需要flash player的版本为10.0.124或更高!

文档简介
  • 上传作者:航空
  • 上传时间:2011-11-19
  • 浏览人气

文档路径主页 > 机务 > 机务手册 > 空客 > 飞机维护手册AMM >

4. Procedure _________ **ON A/C 001-001, 051-052, (Ref. Fig. 401/TASK 28-42-16-991-001) R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499, Post SB 28-1077 For A/C 001-001,051-052,

(Ref. Fig. 401A/TASK 28-42-16-991-001-A) R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499, Subtask 28-42-16-420-052 A. Preparation for Installation (1) Clean the component interface and the adjacent areas with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026). (2) Do an inspection of the component interface and/or the adjacent area. (3) Make sure that the parts retained from the removed component are clean and in the correct condition. Subtask 28-42-16-560-050 B. Preparation of a Replacement Component (Ref. Fig. 402/TASK 28-42-16-991-003) (1) Remove the transport pin (10) from the cadensicon (1) if installed. ____ NOTE : The transport pin (10) is only installed on cadensicon part number 796-809-6A. Cadensicon part numbers 796-809-5 and 796-809-6 do not have a transport pin installed.

R

EFF : 001-049, 051-099, 101-149, 151-199, 201-299, 401-499, CES

28-42-16

Page 410 Aug 01/05


飞行翻译公司 www.aviation.cn
本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 19_部分9.pdf
常用链接:中国航空网 中国通航网 中国公务机网 中国直升机网 民航词典 航空词典 飞行词典 机务词典 飞行翻译 民航翻译 航空翻译 飞机翻译 蓝天翻译 通航翻译 直升机翻译 公务机翻译 机务翻译 翻译民航 翻译飞行 翻译飞机 翻译机务 翻译公务机 翻译直升机 翻译通航 Pilot Jobs 飞行学校 航空器材 Aviation Translation 飞行员英语培训网 航空人才网 航空论坛 蔚蓝飞行翻译公司 北京天航翻译公司 北京飞翔翻译公司
关于我们 | 备案:粤ICP备06006520号
© CopyRight 2006-2020 航空资料室 All Rights ReservedQQ:33066255在线客服
蓝天飞行翻译公司版权声明