航空资料室_民航资料_航空手册_飞行手册_机务手册

A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 23_部分2.pdf500页

显示该文档阅读器需要flash player的版本为10.0.124或更高!

文档简介
  • 上传作者:航空
  • 上传时间:2011-11-19
  • 浏览人气

文档路径主页 > 机务 > 机务手册 > 空客 > 飞机维护手册AMM >

(b) If you did not find damage, do one of these procedures: - replace the shock absorber gland seals (Ref. TASK 32-11-13-000003) and (Ref. TASK 32-11-13-400-003) or - replace the shock absorber (Ref. TASK 32-11-13-000-001) and (Ref. TASK 32-11-13-400-001) or - close the spare-seal activating-valve. 4. Procedure _________ (Ref. Fig. 202/TASK 32-11-13-991-004) Subtask 32-11-13-860-052 A. Close the Spare-Seal Activating-Valve (1) Remove and discard the lockwire from the cap screw (1). (2) Remove and discard the cap screw (1). (3) Turn the spindle (2) clockwise to close the spare-seal activating-valve, hand tighten only. (4) Safety the spindle (2) with MISCELLANEOUS (Material No. 19-010). (5) Clean the area with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026). (6) Make sure that there are no hydraulic leaks. (7) Make a note in the aircraft technical log that: - the MLG spare-seal activating-valve has been closed. ____ NOTE : It is recommended that ALL gland seals on the applicable MLG are replaced at a subsequent scheduled maintenance procedure. Subtask 32-11-13-611-051 B. Check the Contents of the MLG Shock Absorber (1) Make sure that the contents of the MLG shock absorber are at the correct level (Ref. TASK 12-12-32-611-004).

EFF : R CES

ALL

32-11-13

Page 207 May 01/05


飞行翻译公司 www.aviation.cn
本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 23_部分2.pdf
常用链接:中国航空网 中国通航网 中国公务机网 中国直升机网 民航词典 航空词典 飞行词典 机务词典 飞行翻译 民航翻译 航空翻译 飞机翻译 蓝天翻译 通航翻译 直升机翻译 公务机翻译 机务翻译 翻译民航 翻译飞行 翻译飞机 翻译机务 翻译公务机 翻译直升机 翻译通航 Pilot Jobs 飞行学校 航空器材 Aviation Translation 飞行员英语培训网 航空人才网 航空论坛 蔚蓝飞行翻译公司 北京天航翻译公司 北京飞翔翻译公司
关于我们 | 备案:粤ICP备06006520号
© CopyRight 2006-2020 航空资料室 All Rights ReservedQQ:33066255在线客服
蓝天飞行翻译公司版权声明