Subtask 49-00-00-790-055 D. Air Leak Test (1) Start the APU (Ref. TASK 49-00-00-860-008). (2) During APU operation: - supply bleed air. (3) Stop the APU (Ref. TASK 49-00-00-860-009). (4) Put a warning notice in the cockpit to tell persons not to start the APU. Subtask 49-00-00-865-117 E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1KD, 2KD. Subtask 49-00-00-010-072 F. Get Access (1) Put the access platform in position below the APU access doors 315AL and 316AR. (2) Open the APU access doors 315AL and 316AR (Ref. TASK 52-41-00-010001). (3) Set the LIGHT control SW 11LJ to the ON position. Subtask 49-00-00-080-056 G. Make sure that there no leaks at the joint location, and remove the materials used to check leaks. 5. Close-up ________ Subtask 49-00-00-410-076 A. Close Access (1) Make sure that the work area is clean and clear of tool(s) and other items. (2) Set the LIGHT control SW 11LJ to the OFF position.
R
EFF : 001-049, 101-105, 107-107, 151-199, 201-210, CES
49-00-00 Aug 01/05 Page 525 Config-2
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 30_部分2.pdf
R
EFF : 001-049, 101-105, 107-107, 151-199, 201-210, CES
49-00-00 Aug 01/05 Page 525 Config-2
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 30_部分2.pdf