TASK 49-42-51-400-004 Installation of the Starter Motor (131-9(A)) 1. Reason for the Job __________________ Self Explanatory 2. Job Set-up Information ______________________ A. Fixtures, Tools, Test and Support Equipment ------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------No specific B. Consumable Materials ------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------Material No. 03-002 GB DEF-STAN 91-101 LUBRICATING OIL TURBINE ENGINE SYNT BASE (Ref. 20-31-00) Torque Wrench : range 0.00 to 1.20 m.daN (0.00 to 9.00 lbf.ft)
C. Expendable Parts ------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN ------------------------------------------------------------------------------14 packing 49-42-09 01 -030
R
EFF : 001-049, 101-105, 107-107, 151-199, 201-210, CES
49-42-51 Aug 01/05 Page 212 Config-2
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 30_部分6.pdf
C. Expendable Parts ------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN ------------------------------------------------------------------------------14 packing 49-42-09 01 -030
R
EFF : 001-049, 101-105, 107-107, 151-199, 201-210, CES
49-42-51 Aug 01/05 Page 212 Config-2
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 30_部分6.pdf