Subtask 52-71-00-710-053 C. Operational Test (1) Do an operational test of the warning system related to the emergency exits (Ref. TASK 52-71-00-710-001). 5. Close-up ________ Subtask 52-71-00-410-077 A. Installation of the Lining Panel (1) Install the insulation blanket. (2) Install the lining panel: FOR 19WV1 833EZ (Ref. TASK 25-23-47-400-012). FOR 19WV2 834EZ (Ref. TASK 25-23-47-400-013). FOR 21WV1 843EZ (Ref. TASK 25-23-47-400-013). FOR 21WV2 844EZ (Ref. TASK 25-23-47-400-013). Subtask 52-71-00-410-069 B. Close Access (1) Obey the special precautions after the work on the emergency exit (Ref. TASK 52-22-00-860-004). (2) Make sure that the work area is clean and clear of tool(s) and other items. (3) Close the applicable emergency exit 833 or 843 or 834 or 844 (Ref. TASK 52-22-00-410-002). (4) Remove the access platform(s).
EFF : R CES
301-399,
52-71-00
Page 584 May 01/05
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 32_部分10.pdf
EFF : R CES
301-399,
52-71-00
Page 584 May 01/05
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 32_部分10.pdf