TASK 24-38-00-810-814 Battery 2 Fuse Blown 1. Possible Causes _______________ R R R R R BAT-2 (2PB2) CNTOR-LINE, BAT 2 (6PB2) BCL-2 (1PB2) FUSE-BAT 2 wiring
2. Job Set-up Information ______________________ A. Referenced Information ------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------AMM R R R R R R R R R AMM AMM AMM AMM AMM ASM 24-38-00-710-001 24-38-34-000-001 24-38-34-400-001 24-38-51-280-001 24-38-55-000-001 24-38-55-400-001 24-38/01 Operational Test of the Battery Charge Limiter (BCL), (with the CFDS) Removal of the Battery Charge Limiter (BCL) (1PB1, 1PB2) Installation of the Battery Charge Limiter (BCL) (1PB1, 1PB2) Removal of the Batteries 1 and 2 for Restoration Removal of the Battery Line Contactor (6PB1, 6PB2) Installation of the Battery Line Contactor (6PB1, 6PB2)
3. Fault Confirmation __________________ A. Test Do the operational test of the BCL 2 (Ref. AMM TASK 24-38-00-710-001). 4. Fault Isolation _______________ R R R R R R R R A. If the test gives the maintenance message FUSE 4PB2: - replace the FUSE-BAT 2. (1) If the fault continues: - do the check and the restauration of the BAT-2 (2PB2), (Ref. AMM TASK 24-38-51-280-001). (a) If the fault continues: - replace the CNTOR-LINE, BAT 2 (6PB2), (Ref. AMM TASK 24-38-55000-001) and (Ref. AMM TASK 24-38-55-400-001)
EFF : CES
ALL
∞ 24-38-00∞∞ ∞ ∞ ∞ May 01/00 ∞ Page 216
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 排故手册 TSM Trouble Shooting Manual 07_部分4.pdf
2. Job Set-up Information ______________________ A. Referenced Information ------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------AMM R R R R R R R R R AMM AMM AMM AMM AMM ASM 24-38-00-710-001 24-38-34-000-001 24-38-34-400-001 24-38-51-280-001 24-38-55-000-001 24-38-55-400-001 24-38/01 Operational Test of the Battery Charge Limiter (BCL), (with the CFDS) Removal of the Battery Charge Limiter (BCL) (1PB1, 1PB2) Installation of the Battery Charge Limiter (BCL) (1PB1, 1PB2) Removal of the Batteries 1 and 2 for Restoration Removal of the Battery Line Contactor (6PB1, 6PB2) Installation of the Battery Line Contactor (6PB1, 6PB2)
3. Fault Confirmation __________________ A. Test Do the operational test of the BCL 2 (Ref. AMM TASK 24-38-00-710-001). 4. Fault Isolation _______________ R R R R R R R R A. If the test gives the maintenance message FUSE 4PB2: - replace the FUSE-BAT 2. (1) If the fault continues: - do the check and the restauration of the BAT-2 (2PB2), (Ref. AMM TASK 24-38-51-280-001). (a) If the fault continues: - replace the CNTOR-LINE, BAT 2 (6PB2), (Ref. AMM TASK 24-38-55000-001) and (Ref. AMM TASK 24-38-55-400-001)
EFF : CES
ALL
∞ 24-38-00∞∞ ∞ ∞ ∞ May 01/00 ∞ Page 216
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 排故手册 TSM Trouble Shooting Manual 07_部分4.pdf