Determination of the Initial BEW and BEW CG
• “Aeroplanes transferred from one JAA operator with an approved mass control programme to another JAA operator with an approved programme need not be weighed prior to use by the receiving operator unless more than 4 years have elapsed since the last weighing.”
– Appendix 1 to JAR-OPS 1.605 (a)(1)(i)
F-36
飞行翻译公司 www.aviation.cn 本文链接地址:Weight and Balance Establishing and Tracking Airplane Weight_部分2.pdf
• “Aeroplanes transferred from one JAA operator with an approved mass control programme to another JAA operator with an approved programme need not be weighed prior to use by the receiving operator unless more than 4 years have elapsed since the last weighing.”
– Appendix 1 to JAR-OPS 1.605 (a)(1)(i)
F-36
飞行翻译公司 www.aviation.cn 本文链接地址:Weight and Balance Establishing and Tracking Airplane Weight_部分2.pdf