航空资料室_民航资料_航空手册_飞行手册_机务手册
当前位置: 主页 > 航空制造 > 湾流 >

Additional_Conditions_GA270.DOC.pdf7页

显示该文档阅读器需要flash player的版本为10.0.124或更高!

文档简介
  • 上传作者:航空
  • 上传时间:2011-10-01
  • 浏览人气

文档路径主页 > 航空制造 > 湾流 >

ADDITIONAL CONDITIONS
QUALITY CODES – PARTS RELATED

129

Furnish a “Certificate of Compliance” attesting the above parts/materials are manufactured in accordance with and meet the requirements of the drawings/specifications as evidenced by inspection/test. This certificate must accompany each shipment. Furnish a “Certificate of Compliance” attesting the above parts/materials are manufactured in accordance with and meet the requirements of Gulfstream Aerospace “approved” drawings/models/specifications as evidenced by inspection/test. This certificate must accompany each shipment. Repaired/Rebuilt/Overhauled/Inspected/Tested or modified products returned to Gulfstream shall be accompanied by a repair report that includes: Actions taken, parts replaced & inspection/test results. This report must reflect the approved data used. Gulfstream Aerospace, industry or military standards or specifications invoked in applicable drawings and/or specifications and/or listed in the invitation to quote, will apply to all services and supplies to be furnished under this procurement agreement. Revisions in effect as of the date of purchase order apply. Other revision of specifications shall not apply to the work under a resulting purchase order unless accompanied by an engineering order or purchase order amendment. INACTIVE – Do not use (A) Identification shall be in accordance with the applicable engineering documents. Identification shall include but not be limited to the following: 1) Part identification number as shown on the engineering document and/or purchase order. 2) Part revision/modification/configuration level if required by engineering drawing. Must be included on certification documents. 3) Manufacturing date. 4) TSO, PMA, Cage Code data as applicable 5) Serial number, lot, batch and/or heat number (if applicable). Must be included on certification documents. 6) Aircraft control number as applicable by contract requirement. NOTE: If identification method is not defined in the Gulfstream Engineering documents, identification method shall be in accordance with the above and GAMPS 1105 or GAMPS 1106 and the specific subclass as applicable. UNLESS: (B) The product to be identified is made to a “Manufacturing Part Number” in accordance with the purchase order requirements. This could include additional numeric or alpha-numbers in addition to the engineering number.

131

133

259

304 315

GA 270 05/2011

1


飞行翻译公司 www.aviation.cn
本文链接地址:Additional_Conditions_GA270.DOC.pdf
标签自定义标签: Conditions Additional
常用链接:中国航空网 中国通航网 中国公务机网 中国直升机网 民航词典 航空词典 飞行词典 机务词典 飞行翻译 民航翻译 航空翻译 飞机翻译 蓝天翻译 通航翻译 直升机翻译 公务机翻译 机务翻译 翻译民航 翻译飞行 翻译飞机 翻译机务 翻译公务机 翻译直升机 翻译通航 Pilot Jobs 飞行学校 航空器材 Aviation Translation 飞行员英语培训网 航空人才网 航空论坛 蔚蓝飞行翻译公司 北京天航翻译公司 北京飞翔翻译公司
关于我们 | 备案:粤ICP备06006520号
© CopyRight 2006-2020 航空资料室 All Rights ReservedQQ:33066255在线客服
蓝天飞行翻译公司版权声明