3. Job Set-up __________ Subtask 34-42-11-861-050 A. Energize the ground service network (Ref. TASK 24-42-00-861-001). Subtask 34-42-11-865-050 B. Open, safety and tag this(these) circuit breaker(s): ------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION ------------------------------------------------------------------------------FOR 5SA1(6SA1) 121VU COM NAV/RAD ALTM/1 1SA1 K11 FOR 5SA2(6SA2) 121VU COM NAV/RAD ALTM/2 1SA2 K12 4. Procedure _________ **ON A/C 001-049, 051-060, 101-101, (Ref. Fig. 401/TASK 34-42-11-991-001) R **ON A/C 061-099, 102-149, 151-199, 201-299, 301-399, 401-499, (Ref. Fig. 401A/TASK 34-42-11-991-001-A) **ON A/C ALL (Ref. Fig. 402/TASK 34-42-11-991-003) Subtask 34-42-11-020-051 A. Removal of the Radio Altimeter Antenna **ON A/C 001-049, 051-060, 101-101, (Ref. Fig. 401/TASK 34-42-11-991-001)
EFF : CES
ALL
34-42-11
Page 402 Aug 01/05
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 25_部分5.pdf
EFF : CES
ALL
34-42-11
Page 402 Aug 01/05
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 25_部分5.pdf