TASK 36-11-41-400-040 Installation of the Intermediate Pressure (IP) Bleed Check Valve (7110HM) 1. Reason for the Job __________________ Self Explanatory 2. Job Set-up Information ______________________ A. Fixtures, Tools, Test and Support Equipment ------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------No No No No No specific specific specific specific specific B. Consumable Materials ------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------Material No. Material No. Material No. CP11006 CP3010 CP8004 * methyl alcohol (Ref. 70-30-00) * developer, dry (Ref. 70-30-00) * safetywire 0,024in. (0,6mm) (Ref. 70-30-00) clean cloth fiber hammer warning notice FOIL-ALUMINUM (Local Purchase) access platform 0.5 m (1 ft. 8 in.)
C. Expendable Parts ------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN ------------------------------------------------------------------------------15 15 E-seal E-seal 36-11-41 02 -025 36-11-41 02 -025A
EFF : R CES
ALL
36-11-41
Page 406 May 01/04
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 27_部分2.pdf
C. Expendable Parts ------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN ------------------------------------------------------------------------------15 15 E-seal E-seal 36-11-41 02 -025 36-11-41 02 -025A
EFF : R CES
ALL
36-11-41
Page 406 May 01/04
飞行翻译公司 www.aviation.cn 本文链接地址:A319 A320 A321 飞机维护手册 AMM Aircraft Maintenance Manual 27_部分2.pdf