Flight Operations Briefing Notes
Descent Management Descent and Approach Profile Management
Flight Operations Briefing Notes Descent Management Descent and Approach Profile Management
I
Introduction
Inadequate management of descent-and-approach management of aircraft energy level may lead to: • • Loss of vertical situational awareness; and/or, Rushed and unstabilized approaches. profile and/or incorrect
Either situation increases the risk of approach-and-landing accidents, including those involving CFIT.
II
Statistical Data
Approximately 70 % of rushed and unstable approaches involve an inadequate management of the descent-and-approach profile and/or an incorrect management of energy level; this includes: • • Aircraft higher or lower than the desired vertical flight path; and/or, Aircraft faster or slower than the desired airspeed.
III
Best Practices and Guidelines
To prevent delay in initiating the descent and to ensure an optimum management of descent-and-approach profile, descent preparation and approach briefings should be initiated when pertinent data have been received (e.g ATIS, …), and completed before the top-of-descent (typically 10 minutes before).
Page 1 of 6
飞行翻译公司 www.aviation.cn 本文链接地址:Descent Management Descent and Approach Profile Management.pdf
Descent Management Descent and Approach Profile Management
Flight Operations Briefing Notes Descent Management Descent and Approach Profile Management
I
Introduction
Inadequate management of descent-and-approach management of aircraft energy level may lead to: • • Loss of vertical situational awareness; and/or, Rushed and unstabilized approaches. profile and/or incorrect
Either situation increases the risk of approach-and-landing accidents, including those involving CFIT.
II
Statistical Data
Approximately 70 % of rushed and unstable approaches involve an inadequate management of the descent-and-approach profile and/or an incorrect management of energy level; this includes: • • Aircraft higher or lower than the desired vertical flight path; and/or, Aircraft faster or slower than the desired airspeed.
III
Best Practices and Guidelines
To prevent delay in initiating the descent and to ensure an optimum management of descent-and-approach profile, descent preparation and approach briefings should be initiated when pertinent data have been received (e.g ATIS, …), and completed before the top-of-descent (typically 10 minutes before).
Page 1 of 6
飞行翻译公司 www.aviation.cn 本文链接地址:Descent Management Descent and Approach Profile Management.pdf