滚动文档
- 美国ASRS安全公告CALLBACK cb_233.pdf
- 美国ASRS安全公告CALLBACK第329期.pdf
- 美国ASRS安全公告CALLBACK cb_201.pdf
- 民航专业工程安全生产费用管理办法(试行) AP-165-CA-2020-01.pdf
- Computational Methods in Hypersonic Aerodynamics_部分4.pdf
- Missile Guidance and Control Systems 导弹引导和控制系统_部分5.pdf
- 中英合作培养大飞机和发动机设计人才.pdf
- ASRS Directline December 1998.pdf
- ATSB发布客舱释压研究报告.pdf
- The 5th Annual NASA Spacecraft Control Laboratory Experiment (SCOLE) Workshop, part 1.pdf
“其他”的文档列表
美国ASRS安全公告CALLBACK cb_217.pdf
Number 216 June 1997 Forced To Land, Forced to Leave Even with good pre-flight planning, pilots may encounter some unusual problems in-flight. Just accomplishing a take-off can be challenging, as a First Officer can attest in this account of...
- 0|
- 0|
- 0|
- 上传人:航空
2011-10-18 14:08
美国ASRS安全公告CALLBACK cb_216.pdf
Number 216 June 1997 Forced To Land, Forced to Leave Even with good pre-flight planning, pilots may encounter some unusual problems in-flight. Just accomplishing a take-off can be challenging, as a First Officer can attest in this account of...
- 0|
- 0|
- 0|
- 上传人:航空
2011-10-18 14:08
美国ASRS安全公告CALLBACK cb_215.pdf
Number 211 January 1997 The Domino Effect Schedule pressure, poor weather conditions, a runway change in progress, and high traffic volume can stretch both pilot and controller workload nearly to the limit. A Captain tells of an escalating s...
- 0|
- 0|
- 0|
- 上传人:航空
2011-10-18 14:07
美国ASRS安全公告CALLBACK cb_214.pdf
Number 211 January 1997 The Domino Effect Schedule pressure, poor weather conditions, a runway change in progress, and high traffic volume can stretch both pilot and controller workload nearly to the limit. A Captain tells of an escalating s...
- 0|
- 0|
- 0|
- 上传人:航空
2011-10-18 14:07
美国ASRS安全公告CALLBACK cb_213.pdf
Number 211 January 1997 The Domino Effect Schedule pressure, poor weather conditions, a runway change in progress, and high traffic volume can stretch both pilot and controller workload nearly to the limit. A Captain tells of an escalating s...
- 0|
- 0|
- 0|
- 上传人:航空
2011-10-18 14:07
美国ASRS安全公告CALLBACK cb_212.pdf
Number 211 January 1997 The Domino Effect Schedule pressure, poor weather conditions, a runway change in progress, and high traffic volume can stretch both pilot and controller workload nearly to the limit. A Captain tells of an escalating s...
- 0|
- 0|
- 0|
- 上传人:航空
2011-10-18 14:07
美国ASRS安全公告CALLBACK cb_211.pdf
Number 211 January 1997 The Domino Effect Schedule pressure, poor weather conditions, a runway change in progress, and high traffic volume can stretch both pilot and controller workload nearly to the limit. A Captain tells of an escalating s...
- 0|
- 0|
- 0|
- 上传人:航空
2011-10-18 14:07
美国ASRS安全公告CALLBACK cb_210.pdf
Number 206 August 1996 End of Tail Last month, we looked at some of the results of taxiway and runway incursion incidents. This month, we focus on a specific taxiway incursion issue encountered by pilots at a number of busy airports. An air...
- 0|
- 0|
- 0|
- 上传人:航空
2011-10-18 14:07
美国ASRS安全公告CALLBACK cb_209.pdf
Number 206 August 1996 End of Tail Last month, we looked at some of the results of taxiway and runway incursion incidents. This month, we focus on a specific taxiway incursion issue encountered by pilots at a number of busy airports. An air...
- 0|
- 0|
- 0|
- 上传人:航空
2011-10-18 14:07
美国ASRS安全公告CALLBACK cb_208.pdf
Number 206 August 1996 End of Tail Last month, we looked at some of the results of taxiway and runway incursion incidents. This month, we focus on a specific taxiway incursion issue encountered by pilots at a number of busy airports. An air...
- 0|
- 0|
- 0|
- 上传人:航空
2011-10-18 14:07