Normal VFR Landing
ROPAT
Volume 1 09-12-37
PF PNF “ ” CALL RESPONSE
CL300_SOP_036
Sep 13/2004 REV 1
• Flaps 30 • Airspeed VREF • • • • • Flaps 20 Gear down Airspeed VREF + 20 kt Before Landing checklist Complete to flaps 30
Two Engines
Normal VFR Landing Pattern Figure 09-12-02
Flight Crew Operating Manual CSP 100-6
Entry leg • Gear up • Flaps 0 • Airspeed VREF + 40 kt • Continue Approach checklist
• Flaps 10 • Airspeed VREF + 30 kt
飞行翻译公司 www.aviation.cn 本文链接地址:庞巴迪挑战者300公务机机组操作手册 Bombardier_Challenger_Global_00-Normal_VFR_Landing.pdf
ROPAT
Volume 1 09-12-37
PF PNF “ ” CALL RESPONSE
CL300_SOP_036
Sep 13/2004 REV 1
• Flaps 30 • Airspeed VREF • • • • • Flaps 20 Gear down Airspeed VREF + 20 kt Before Landing checklist Complete to flaps 30
Two Engines
Normal VFR Landing Pattern Figure 09-12-02
Flight Crew Operating Manual CSP 100-6
Entry leg • Gear up • Flaps 0 • Airspeed VREF + 40 kt • Continue Approach checklist
• Flaps 10 • Airspeed VREF + 30 kt
飞行翻译公司 www.aviation.cn 本文链接地址:庞巴迪挑战者300公务机机组操作手册 Bombardier_Challenger_Global_00-Normal_VFR_Landing.pdf