ROPAT
Volume 1 09-12-43
• • • •
“SPEED CHECK” “SELECTED FLAPS 20” “INDICATING FLAPS 20” “HOLDING AT FLAPS DOWN”
PF PNF “ ” CALL RESPONSE
CL300_SOP_015
Sep 13/2004 REV 1
Reduce power “FLAPS 0” “GEAR UP” Downwind leg • “FLAPS 10” • VREF 180 kt Pitch airplane Ensure power attained VREF + 25 Midfield • “FLAPS 20, GEAR DOWN, Positive BEFORE-LANDING rate CHECKLIST” Rotate
50 ft
Touch-and-Go Landing
NOTE: During touch-and-go landings, do not arm spoilers
Entry leg • Clean, 180 kt • “APPROACH CHECKLIST”
Remaining in the traffic path 160 kt
Touch-and-Go Landing Figure 09-12-05
Lower nose to surface • “SELECTED FLAPS 10” • “INDICATING FLAPS 10” “FLAPS DOWN” VREF +10°
1500 ft AGL
Final approach • Stabilize VREF prior to 50 ft
Flight Crew Operating Manual CSP 100-6
Speed check Selected for indicating flaps down Abeam touchdown zone
Entry • Clean, 180 kt or below • “APPROACH CHECKLIST COMPLETE”
After landing • Reset flaps 20 • Reset elevator trim to takeoff • Check EICAS • Power set
飞行翻译公司 www.aviation.cn 本文链接地址:庞巴迪挑战者300公务机机组操作手册 Bombardier_Challenger_Global_00-Touch_and_Go_Landing.pdf
Volume 1 09-12-43
• • • •
“SPEED CHECK” “SELECTED FLAPS 20” “INDICATING FLAPS 20” “HOLDING AT FLAPS DOWN”
PF PNF “ ” CALL RESPONSE
CL300_SOP_015
Sep 13/2004 REV 1
Reduce power “FLAPS 0” “GEAR UP” Downwind leg • “FLAPS 10” • VREF 180 kt Pitch airplane Ensure power attained VREF + 25 Midfield • “FLAPS 20, GEAR DOWN, Positive BEFORE-LANDING rate CHECKLIST” Rotate
50 ft
Touch-and-Go Landing
NOTE: During touch-and-go landings, do not arm spoilers
Entry leg • Clean, 180 kt • “APPROACH CHECKLIST”
Remaining in the traffic path 160 kt
Touch-and-Go Landing Figure 09-12-05
Lower nose to surface • “SELECTED FLAPS 10” • “INDICATING FLAPS 10” “FLAPS DOWN” VREF +10°
1500 ft AGL
Final approach • Stabilize VREF prior to 50 ft
Flight Crew Operating Manual CSP 100-6
Speed check Selected for indicating flaps down Abeam touchdown zone
Entry • Clean, 180 kt or below • “APPROACH CHECKLIST COMPLETE”
After landing • Reset flaps 20 • Reset elevator trim to takeoff • Check EICAS • Power set
飞行翻译公司 www.aviation.cn 本文链接地址:庞巴迪挑战者300公务机机组操作手册 Bombardier_Challenger_Global_00-Touch_and_Go_Landing.pdf