Abort or Rejected Takeoff
ROPAT
Volume 1 09-14-03
PF PNF “ ” CALL RESPONSE
CL300_SOP_003
Sep 13/2004 REV 1
Problem recognized prior to V1 (either pilot) • • • • If required, perform emergency evacuation Brakes – apply and hold,maximum effort Thrust levers – idle Verify spoilers extended Thrust reversers – deploy as required After turning clear of runway • “CLEARING RUNWAY CHECKLIST” “CLEARING RUNWAY CHECKLIST COMPLETE” NOTE: If turnaround brake energy weight or landing maximum brake energy weight was exceeded, refer to the AFM for further disposition. “ABORT, ABORT, ABORT” (either pilot) Problem recognized prior to V1 “TOWER, CHALLENGER XXX HAS ABORTED THE TAKEOFF ON RUNWAY XX”
Engine Failure Below V1 Speed
Engine Failure Below V1 Speed Figure 09-14-01
Flight Crew Operating Manual CSP 100-6
Normal takeoff procedures
飞行翻译公司 www.aviation.cn 本文链接地址:庞巴迪挑战者300公务机机组操作手册 Bombardier_Challenger_Global_00-Rejected_Takeoff.pdf
ROPAT
Volume 1 09-14-03
PF PNF “ ” CALL RESPONSE
CL300_SOP_003
Sep 13/2004 REV 1
Problem recognized prior to V1 (either pilot) • • • • If required, perform emergency evacuation Brakes – apply and hold,maximum effort Thrust levers – idle Verify spoilers extended Thrust reversers – deploy as required After turning clear of runway • “CLEARING RUNWAY CHECKLIST” “CLEARING RUNWAY CHECKLIST COMPLETE” NOTE: If turnaround brake energy weight or landing maximum brake energy weight was exceeded, refer to the AFM for further disposition. “ABORT, ABORT, ABORT” (either pilot) Problem recognized prior to V1 “TOWER, CHALLENGER XXX HAS ABORTED THE TAKEOFF ON RUNWAY XX”
Engine Failure Below V1 Speed
Engine Failure Below V1 Speed Figure 09-14-01
Flight Crew Operating Manual CSP 100-6
Normal takeoff procedures
飞行翻译公司 www.aviation.cn 本文链接地址:庞巴迪挑战者300公务机机组操作手册 Bombardier_Challenger_Global_00-Rejected_Takeoff.pdf