航空资料室_民航资料_航空手册_飞行手册_机务手册

庞巴迪公务机操作手册 利尔 Bombardier_Learjet-Normal_Takeoff.pdf1页

显示该文档阅读器需要flash player的版本为10.0.124或更高!

文档简介
  • 上传作者:航空
  • 上传时间:2011-10-18
  • 浏览人气

文档路径主页 > 飞行 > 飞行手册 > 庞巴迪 > 庞巴迪利尔公务机 >

Recommended Procedures/Techniques

PF PNF “ ” CALL RESPONSE

L40_SOP_001

MP-132 May 2004
Clear of obstacles Approaching 200 KIAS • Set maximum continuous climb power • Reduce thrust to and accelerate airplane to 250 KIAS remain below 200 KIAS in airport traffic area Class D airspace “AFTER TAKEOFF CHECKLIST” “FLAPS UP, YAW DAMPER ENGAGE” (if desired) “AFTER TAKEOFF CHECKLIST COMPLETE” “GEAR UP • “FLAP SELECTED UP, INDICATING UP” • “YAW DAMPER ENGAGED” (at 400 AGL and clear of obstacles) “V2 + 25 KNOTS” • “GEAR SELECTED UP” • “INDICATING UP” “POSITIVE RATE” (when a positive rate of climb is established) “V1” “ROTATE”

Normal Takeoff

Learjet 40/45

Standing or Rolling

Rolling takeoff • Add 300 ft to scheduled takeoff field length

Before takeoff • Hold brakes and advance power to takeoff detent • “SET N1” • Release brakes • On rolling takeoff – no brakes VR • Rotate airplane to takeoff attitude 12 to 15°

“CROSS-CHECKED”

Takeoff Procedures–Standing/Rolling Start Figure 1 - 1

V1 • Release thrust levers

“90-KNOTS”

• “RUNWAY LINEUP CHECKLIST” • “APR – ARMED” • “LINEUP CHECKLIST COMPLETE”

• Check N1 bugs match • “N1 SET”

1-35


飞行翻译公司 www.aviation.cn
本文链接地址:庞巴迪公务机操作手册 利尔 Bombardier_Learjet-Normal_Takeoff.pdf
常用链接:中国航空网 中国通航网 中国公务机网 中国直升机网 民航词典 航空词典 飞行词典 机务词典 飞行翻译 民航翻译 航空翻译 飞机翻译 蓝天翻译 通航翻译 直升机翻译 公务机翻译 机务翻译 翻译民航 翻译飞行 翻译飞机 翻译机务 翻译公务机 翻译直升机 翻译通航 Pilot Jobs 飞行学校 航空器材 Aviation Translation 飞行员英语培训网 航空人才网 航空论坛 蔚蓝飞行翻译公司 北京天航翻译公司 北京飞翔翻译公司
关于我们 | 备案:粤ICP备06006520号
© CopyRight 2006-2020 航空资料室 All Rights ReservedQQ:33066255在线客服
蓝天飞行翻译公司版权声明