Learjet 40/45
MP-132 May 2004
PF PNF “ ” CALL RESPONSE
L40_SOP_003
3-4
Problem recognized prior to V1 setting (either pilot) • • • • After turning clear of runway • “CLEARING RUNWAY CHECKLIST” If required, perform emergency evacuation Brakes – apply and hold, maximum effort Thrust levers – idle Spoilers – verify extended Thrust reversers – deploy, if necessary “CLEARING RUNWAY CHECKLIST COMPLETE” NOTE: Refer to the AFM for brake energy limits. “ABORT, ABORT, ABORT” (either pilot) Problem recognized prior to V1 “TOWER, LEAR XXX HAS ABORTED THE TAKEOFF ON RUNWAY XX”
Abort or Rejected Takeoff
Recommended Procedures/Techniques
Engine Failure Below V1 Speed
Engine Failure Below V1 Speed Figure 3 - 1
Normal takeoff procedures
飞行翻译公司 www.aviation.cn 本文链接地址:庞巴迪公务机操作手册 利尔 Bombardier_Learjet-Rejected_Takeoff.pdf
MP-132 May 2004
PF PNF “ ” CALL RESPONSE
L40_SOP_003
3-4
Problem recognized prior to V1 setting (either pilot) • • • • After turning clear of runway • “CLEARING RUNWAY CHECKLIST” If required, perform emergency evacuation Brakes – apply and hold, maximum effort Thrust levers – idle Spoilers – verify extended Thrust reversers – deploy, if necessary “CLEARING RUNWAY CHECKLIST COMPLETE” NOTE: Refer to the AFM for brake energy limits. “ABORT, ABORT, ABORT” (either pilot) Problem recognized prior to V1 “TOWER, LEAR XXX HAS ABORTED THE TAKEOFF ON RUNWAY XX”
Abort or Rejected Takeoff
Recommended Procedures/Techniques
Engine Failure Below V1 Speed
Engine Failure Below V1 Speed Figure 3 - 1
Normal takeoff procedures
飞行翻译公司 www.aviation.cn 本文链接地址:庞巴迪公务机操作手册 利尔 Bombardier_Learjet-Rejected_Takeoff.pdf